Panama
July 19, 2014



Above: The water lowers in the second Gatun Lock to Atlantic sea level.

Below: Pictures 1 to 3 as the water lowers in the second Gatun Lock.
Picture 4 shows as the Pacific Queen leave the Gatun Locks.
Pictures 5, 6 and 9 show the Global Rose, and the NYK Remus leaving the Gatun Locks.
Picture 7 shows as the new doors for the new Locks, scheduled to be completed in late 2015.
Picture 8 shows the yacht leaving the Gatun Locks.
Picture 10 shows a fisheye view inside the Pacific Queen top floor.


Touch a picture number











Pages:
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11