Panamá
January 18, 2020



Above: The Panamax ship LNG Steno Bulk continues to move through the new locks opened in 2016, as the Marlin Amethyst moves to the front of the first Miraflores lock.

1, 4, 6 and 7 show the Marlin Amethyst continuing to move to the end of the first lock.

2 and 3 show the electric mules running on the lock walls.

5 show the progress on the Panamax LNG Steno Bulk ship.

8 and 9 show the control house ... note the water level is starting to decrease ... about 26 million gallons is being transferred to the lock system
on the west side in about the time it takes to fill your bathtub.

Touch a number










Pages:
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10